top of page

Federal Contracting

 
j&j logo blk transparent.png
Service-Disabled Veteran-Owned-Certified.jpg

IDENTIFYING INFORMATION

 

FEIN: 56-2040372

 

DUNS: 149186228

 

CAGE: 3W5B8

 

NAIC CODES:

236118  - Residential Remodelers

236210  - Industrial Building Construction

236220  - Commercial and Institutional Building Construction

238130  - Framing Contractors

238310  - Drywall and Insulation Contractors

238320  - Painting and Wall Covering Contractors

238330  - Flooring Contractors

238350  - Finish Carpentry Contractors

561621  - Security Systems Services (except Locksmiths)

remodel
Capability Statement

Core Competencies

General Contracting and Project Management

Framing

Drywall (Hang, Finish, Paint)

Acoustical Ceilings

Flooring (Vinyl Tiles, Carpet Squares, Luxury Vinyl Planks, Rubber Floors)

Millwork Installation

Insulation (Wall and Ceiling)

Doors (Frames, Slabs, Hardware)

Construction Site Managers
Photo1.jpg

PAST PERFORMANCE

MCO Airport – Spirit Airlines OCC/CEET Renovation - $840,000.00 – July 2020

PROJECT DESCRIPTION: Design Build - Interior and exterior renovation of existing building for Spirit Airlines (Multiple Phase). Exterior work consisted of resurface parking lot, provide new line striping for parking spaces, repaint exterior of building, and install new signage. Interior work consisted of patch and repair holes, demolition of all flooring and some interior offices, installation of new flooring and cove base throughout, electrical and data modifications to fit new layout, installation of new lighting, installation of new kitchenette, installation of (2) OH doors in existing CMU walls, paint interior of

building, installation of fuselage in building, and replace ACT and grid as needed.

BWI Airport – AFCO, Inc. New Warehouse Restrooms - $350,000.00 –March 2019

PROJECT DESCRIPTION: Design Build - Modify existing single stall restroom into new 8 stall men and 8 stall women restrooms in existing warehouse space. Demolition of existing single stall restroom, trench out for new plumbing, installation of new underground plumbing, back fill and pour new concrete, framing for new restroom layout, electrical and plumbing rough-ins, drywall and installation of new ceiling and dust cap, installation of new fixtures, installation of new epoxy flooring, installation of barriers protecting warehouse restroom from forklift operations.

 

LAX Airport - Hensel Phelps Terminal 1 Passenger Boarding Bridge Replacement - $ 1,800,000.00 - March 2018

PROJECT DESCRIPTION: Remove and replace (12) Passenger Boarding Bridges (PBB), PC Airs and Ground Power Units with new owner supplied replacements. Project includes demolition of existing PBB and rotunda and installation of new rotunda, PBB, PC Air, Ground Power Units and electrical.

OUR CUSTOMERS

Emblem_of_the_United_States_Navy.svg
Seal_of_the_United_States_Federal_Aviation_Administration.svg
USDA-e1420474769848-900x455
1200px-Transportation_Security_Administr
Flying Plane

WORK WITH A CONTRACTOR THAT WILL GET THE JOB DONE

 
 

WE ARE A SERVICE DISABLED VETERAN OWNED SMALL BUSINESS

bottom of page