

Federal Contracting


IDENTIFYING INFORMATION
FEIN: 56-2040372
DUNS: 149186228
CAGE: 3W5B8
NAIC CODES:
236118 - Residential Remodelers
236210 - Industrial Building Construction
236220 - Commercial and Institutional Building Construction
238130 - Framing Contractors
238310 - Drywall and Insulation Contractors
238320 - Painting and Wall Covering Contractors
238330 - Flooring Contractors
238350 - Finish Carpentry Contractors
561621 - Security Systems Services (except Locksmiths)
Core Competencies
General Contracting and Project Management
Framing
Drywall (Hang, Finish, Paint)
Acoustical Ceilings
Flooring (Vinyl Tiles, Carpet Squares, Luxury Vinyl Planks, Rubber Floors)
Millwork Installation
Insulation (Wall and Ceiling)
Doors (Frames, Slabs, Hardware)


PAST PERFORMANCE
MCO Airport – Spirit Airlines OCC/CEET Renovation - $840,000.00 – July 2020
PROJECT DESCRIPTION: Design Build - Interior and exterior renovation of existing building for Spirit Airlines (Multiple Phase). Exterior work consisted of resurface parking lot, provide new line striping for parking spaces, repaint exterior of building, and install new signage. Interior work consisted of patch and repair holes, demolition of all flooring and some interior offices, installation of new flooring and cove base throughout, electrical and data modifications to fit new layout, installation of new lighting, installation of new kitchenette, installation of (2) OH doors in existing CMU walls, paint interior of
building, installation of fuselage in building, and replace ACT and grid as needed.
BWI Airport – AFCO, Inc. New Warehouse Restrooms - $350,000.00 –March 2019
PROJECT DESCRIPTION: Design Build - Modify existing single stall restroom into new 8 stall men and 8 stall women restrooms in existing warehouse space. Demolition of existing single stall restroom, trench out for new plumbing, installation of new underground plumbing, back fill and pour new concrete, framing for new restroom layout, electrical and plumbing rough-ins, drywall and installation of new ceiling and dust cap, installation of new fixtures, installation of new epoxy flooring, installation of barriers protecting warehouse restroom from forklift operations.
LAX Airport - Hensel Phelps Terminal 1 Passenger Boarding Bridge Replacement - $ 1,800,000.00 - March 2018
PROJECT DESCRIPTION: Remove and replace (12) Passenger Boarding Bridges (PBB), PC Airs and Ground Power Units with new owner supplied replacements. Project includes demolition of existing PBB and rotunda and installation of new rotunda, PBB, PC Air, Ground Power Units and electrical.
OUR CUSTOMERS
![]() | ![]() | ![]() |
---|---|---|
![]() |